english | français | deutsch | español


K2 St Katherine’s Docks

k2 1k2 2

 

Ort: St Katherine’s Dock, London
Kurzbeschreibung: Prestigious £50 million, eight story office building, with a capacity of around 16 000m2
Bauherr(en): Mercer Human Resource Development
Fertigstellung: 2004
Architekt(en): Richard Rogers Partnership
Tragwerksplaner: Waterman Partnership
Generalunternehmer: Taylor Woodrow
Stahlbauer: Rowecord Engineering
CIDECT-Mitglied: Corus Tubes

 

Details:
The concrete filled column solution gives the necessary strength and stiffness whilst retaining slim line elegance and the required fire resistance.Corus Tube’s Technical advisory service helped the designers optimize the structure for fire safety purposes with the minimum of intumescent coating and the maximum continuity of the column diameter.