| Location: | Stuttgart, Germany |
| Brief description: | New construction: 151 m long viaduct |
| Awarding authority: | City of Stuttgart, Technical Department - Civil Engineering Office |
| Completion: | September 1999 |
| Architect: | Schlaich Bergmann und Partner GbR, Stuttgart together with Luz und Partner (landscape design) and Büro Gertis + Fuchs (noise emission measurement) |
| Steel Constructor: | Stahlbau Illingen GmbH, Illingen; Wolff & Müller GmbH & Co.KG, Stuttgart |
| Cidect member: | V & M DEUTSCHLAND GmbH |
Details:
A two-storey deck means that pedestrians and vehicles are on two different levels. With its filigree design based on steel tree-like columns, the bridge blends harmoniously with its environment. V & M supplier part: 200 t circular MSH sections with 193.7 and 323.9 mm outside diameters, wall thickness from 10 to 70 mm, material: S 355 J2H.