| Location: | Cwm in Ebbw Vale, Blaenau Gwent |
| Brief description: | Footbridge spanning the Newport to Ebbw railway line and the new Cwm Relief Road |
| Awarding authority: | Blaenau Gwent Borough Council |
| Completion: | 2004 |
| Architect: | Andrew Rowe |
| Steel Constructor: | Rowecord Engineering |
| Cidect member: | Corus Tubes |
Details:
70 m long footbridge has a span of 35 m and a 30 m
mast set at an angle against the valley hillside.The maximum gradient of the bridge was
determined by the levels of the land, and a stepped ramp leads to it from the
lower level on the west side.